Go top
Project information

Additional developments in the stochastic hydrothermal coordination model MHE. Year 2010

A. Ramos J.M. Latorre S. Cerisola

January 2010 - December 2010

Funding entity Iberdrola


The objective of the project is to improve the stochastic hydrothermal coordination model integrated into the set of decision support models for market operation planning and to do small improvements in other stochastic simulation tool for the hydro system.
The tasks developed are the following:
a) Analysis of the water release tables of relevant reservoirs.
b) Improvements in the SDDP decomposition algorithm.
c) Use of the model for the short term.
d) Flexibility in the time definition of the model scope.
e) Improvement of the model interface and documentation.


IBD_DesAdc2010